Physical Infrastructure Assessment
High-Density AI/Compute Site Survey
⚡ UP TO 120kW PER RACK
⚠️ You're offline. Data will be saved locally.
📋
Deployment Requirements
From partner SE/architect
ℹ️ Enter the hardware requirements provided by the partner. This drives our PI assessment calculations.
kW
BTU/hr
Auto-calculated: kW × 3412
lbs
🏢
Site Information
Location being assessed
📷
Tap to capture
🚚
Delivery & Access
Equipment delivery path
⚠️ High-density AI racks can weigh 3,000+ lbs and require special delivery considerations.
📷
Loading dock, elevator, pathways
Power Capacity Assessment
Required vs. available
Required
kW
Available
kW
kW
🔌
Utility Service
Building electrical service
📷
Main panel/switchgear
🔋
UPS Infrastructure
Existing backup power
kVA
kVA
min
📷
UPS equipment & nameplate
🔗
Power Distribution
PDUs and receptacles
📷
PDUs, floor boxes, overhead busway
Generator/Emergency Power
Backup power source
kW
❄️
Cooling Capacity Assessment
Required vs. available
Heat Output
BTU/hr
Cooling Avail.
Tons
tons
1 ton = 12,000 BTU/hr
🌀
Cooling Systems
Current cooling infrastructure
tons
📷
CRAC/CRAH, containment, airflow
💧
Liquid Cooling Feasibility
For high-density requirements
ℹ️ Deployments >40kW/rack typically require liquid cooling solutions (DTC, rear-door, or immersion).
📐
Space Assessment
Physical dimensions
📷
Room layout, rack rows, aisles
⚖️
Floor Loading
Structural capacity
lb/ft²
🌡️
Environmental Controls
Monitoring & safety
📊
Assessment Summary
Review before submission
Project
Location
Target Racks
Total Power
Readiness Checklist
📝
Final Notes
📷
Any additional photos
🚀
Submit Assessment